Completed Projects

“”””

S.N. Title of the Project Year Project Area Name of Client/ Proponent Description of Work
1 IEE of Api Nampa Conservation Area Management Plan (2020-2024) 2022 Darchula, Sudurpaschim Province Api Nampa Conservation Area Office Preparation of ToR of IEE Study. Baseline Study of Socio-economic, Physical and Biological Environment of the Project Area. Impact and Issues Identification, Alternative Analysis of Different Aspects of Project, Identification of Mitigation and Enhancement Measures, Preparation of Environmental Management Plan and Monitoring Schedule.
2 IEE of Sunniva Inn Boutique Hotel and Spa 2022 Omsatiya Rural Municipality, Ward no. 1, Rupandehi, Lumbini Province Sunniva Inn Boutique Hotel and Spa Pvt. Ltd. Preparation of ToR of IEE Study. Baseline Study of Socio-economic, Physical and Biological Environment of the Project Area. Impact and Issues Identification, Alternative Analysis of Different Aspects of Project, Identification of Mitigation and Enhancement Measures, Preparation of Environmental Management Plan and Monitoring Schedule.
3 Sub-watershed Management Plan of Lower Karra 2022 Hetauda, Makwanpur, Bagmati Province Soil Conservation and Watershed Management Office Makwanpur Preparation of Sub-watershed management plan of Lower Karra
4 Bagmati Province Watershed Strategy (2022-2030) 2022 Bagmati Province Ministry of Forests and Environment Bagmati Province Watershed Strategy
5 Initial Environmental Examination (IEE) of Lumbini Amusement Park 2022 Siddharthanagar Municipality, Ward no. 1, Rupandehi, Lumbini Province Lumbini Amusement Park & Resort Pvt. Ltd. Conducted field visit and prepared IEE report of Lumbini Amusement Park: Preparation of ToR of IEE Study. Baseline Study of Socio-economic, Physical and Biological Environment of the Project Area. Impact and Issues Identification, Alternative Analysis of Different Aspects of Project, Identification of Mitigation and Enhancement Measures, Preparation of Environmental Management Plan and Monitoring Schedule.
6 Carry out Household Survey, Data Entry and Analysis of Chainpur Seti Hydro Electric Project (210 MW) 2022 Bajhang, Sudurpashchim Province Nepal Electricity Authority, Environment and Social Studies Department Conducted household survey, data entry and analysis of around 400 PAFs of the project, conducted FGD in each ward of the affected RMs and one PRA in each affected RM, Prepared baseline socio-economic tables and impact tables.
7 Enumerator services to collect information for Community-based Organization (CBO) Profile Development 2022 Sindhuli, Udayapur, Sarlahi, Dhanusa, Mahottari, Siraha, Saptari, Sunsari, Morang, Dhankuta, Jhapa, Ilam Building a Resilient Churia Region in Nepal (BRCRN), The Food Agriculture Organization of the United Nations Conducted field visits to identify potential CBOs in the 26 river systems; Collect and compile the information to generate profiles of these CBOs and validated the developed profile.
8 An Assessment of Carbon Sequestration and Emission in Gandaki Province 2022 Gandaki Province Forest Research and Training Centre, Gandaki Conducted field visits to different government departments and performed KII. Reviewed literatures to collect required information on carbon emissions and determined total carbon emission and sequestration of Gandaki Province.
9 Participatory Assessment to Identify Priority Communities and Forest Areas in Project Sites 2022 Bardiya, Lumbini Province and Kailali, Sudurpashchim Province Integrated Landscape Management to Secure Nepal’s Protected Areas and Critical Corridors (ILaM) Participatory assessment through local level stakeholder’s consultation and focus group discussion and field survey to identify priority communities, villages and forest areas for on ground conservation interventions.
10 Assessment of Carbon Sequestration in Private Forest for REDD IC 2022 Chitwan and Kavre, Bagmati Province REDD Implementation Center Field data collection to estimate carbon stock in private forests of Terai region and Hilly region of Nepal. Comparison of these carbon stocks and discussion on factors affecting carbon stock in these regions.
11 Preparation of Indicators for Technical Audit of Forest Management and Conduct Technical Audit at Two Sites 2022 Kathmandu, Bagmati province Department of Forests and Soil Conservation Preparation of indicators for technical audit of forest management and conduct two audits.
12 Preparation of Harvesting Plan of Scientific Forest Managment Operational Plan of Tamagadi Collaborative Forest 2022 Bara, Madhesh Province Tamagadhi Collaborative Forest Management Committee Forest Inventory, Stem mapping of Scientific Forest Management, Delineation of Forest Fire line, Grazing Areas,etc.
13 EIA of Sisuwa Khola Hydropower Project 2022 Silichong Rural Municipality, Ward no. 1 and 2, Sankhuwasabha, Province No. 1 Matribhumi Hydropower Development Company Pvt. Ltd. IEE of 13.5 MW capacity Sisuwa Khola Hydropower Project: Impact Prediction and Analysis, Alternative Analysis, Enhancement and Mitigation Measures, Monitoring Schedule.
14 Environmental Impact Assessment (EIA) of Contact Office Building Complex for Head of State (Head of Province), Chief Ministry and Quarter Building for Ministry (Federal Ministers) 2022 Lalitpur Metropolitan City, Ward no. 18 and 25, Lalitpur, Bagmati Province Department of Urban Development and Building Construction Preparation of SD and ToR. Conducting Baseline survey on different aspects of Socio-economic, Physical and Biological Environment of Project Area. Impact and Issues Prediction and Analysis of the project. Alternative Analysis, Mitigation and Enhancement measures Identification, Preparation of Environment Management Plan, Environmental Monitoring and Environmental Auditing Schedule.
15 Feasibility study of Agroforest Management System in the district of Inner Terai of Bagmati Province, Site selection and Model Identification Action Plan of one of the Identified Area 2021 Bagmati Province Ministry of Industry, Tourism, Forest and Environment, Bagmati Province Site selection and Model Identification Action Plan of one of the Identified Area
16 Feasibility study for Control and Reuse of Plastic Wastes 2021 Butwal, Lumbini Province Ministry of Industry, Tourism, Forest and Environment, Lumbini Province Conducted field visits for feasibility study to control and reuse of plastic wastes.
17 Preparing Forest Management Action Plan for Forests of Upper Dhading; Jharlang, Tipling, Lapa, Pholkharka, Satyadevi 2021 Dhading, Bagmati Province Division Forest Office, Dhading Conducted boundary survey and mapping of forests, assessment of resources, wildlife and their habitat, cash valuation of PES and other ecological benefits of protected forests; Estimated population of threatened flora and fauna and prepared management action plan for management of protected forests.
18 A Study on Potential Artificial Water Recharge Zones in Chakhel Khola and Chitlang Khola Sub-watershed of Makwanpur District, Nepal 2021 Makwanpur, Bagmati Province Department of Forests and Soil Conservation Conducted consultation meeting with DoFSC and local level stakeholders, Field visits to collect hydro-geological data of springs and bio-physical and socio-economic data of watershed area and applied RS/GIS to identify potential recharge zones and to recommend water recharge methods.
19 IEE of Construction of Jawan Line Building and Premise Development of Chandi Dal Battalion 2021 Singhadurbar, Kathmandu Metropolitan City, Ward no. 29, Kathmandu, Bagmati Province Special Building Construction Project Coordination Office (SBCPCO) IEE report was prepared for Construction of Jawan line building and premise development for Chandi Dal Battalion.
20 Preparation of Action Plan Manual for Environment Friendly Local Bodies 2021 Kathmandu, Bagmati province Department of Environment, DoFE An action plan manual to develop environment friendly local bodies was prepared.
21 Assessment of Water Quality Parameter Status of Lake Cluster of Pokhara Valley (LCPV), Nepal 2021 Pokhara, Kaski, Gandaki Province World Wildlife Fund Inc. Field visit was done to test water quality and identify potential source of pollution in the lakes of LCPV. The tested water quality parameters were temperature, pH, conductivity, DO, TDS, BOD, Ammonia, Nitrate, Phosphate, Heavy metal (Fe) and macroinvertebrates.
22 Study of Biodiversity Hotspot in Chitwan-Annapurna Landscape (CHAL) Area 2021 Chitwan-Annapurna Landscape (CHAL) Department of Forest and Soil Conservation Conducted field visits and identified biodiversity hotspots in the CHAL region of Nepal.
23 Study on Forest Encroachment in the Chure Region of Nepal (East of Narayani River) 2021 Chure region President Chure-Tarai Madhesh Conservation Development Board Detection and analysis of land cover change using GIS mapping, delineation of encroachment areas and analysis of drivers of encroachment were done followed by field verification and consultations with local level stakeholders
24 Diet Analysis of Wild animals of Pachbhaiya zoological park 2021 Pachbhaiya, Pokhara, Kaski, Gandaki Province Forest Research and Training Centre, Gandaki Province Diet analysis of captive wild animals was done to identify preferred diet, examine optimal nutrient composition, quantity and frequency of food for wild animals. Alternatives considering cost and diet management were also recommended.
25 Consulting Service of Environmental Safeguard Officer for Site Office of New Modi Lekhnath 132 kV Transmission Line Project 2021 Lahachauk, Kaski, Gandaki Province Nepal Electricity Authority, Environment and Social Studies Department Provided the required environmental safeguard officer and submitted monthly report of the work to the client.
26 Study on Causes of Death of One Horned Rhino and Change in Habitat of Wildlife in Chitwan National Park 2021 Chitwan, Bagmati Province Department of National Parks and Wildlife Reserve Understanding population structure and mortality of Rhinoceros in CNP, Identify the ecological stress on rhino survival, habitat use pattern, and Identification of existing and potential threats for rhino conservation. Review of published and unpublished literature, Field visits, and observation and Expert consultation.
27 Documentation of Zoological Parks in Community Forest and Local Authority 2021 All Zoological Parks in Nepal Department of Forests and Soil Conservation Assessment of zoological parks and rescue centre all over Nepal.
28 Feasibility Study of Commercial Leasehold Forest in Nepal 2021 Nepal Department of Forests and Soil Conservation Feasibility Study of Commercial Leasehold Forest in Nepal was done.
29 Preparation of Multiple Use Forest Development Strategy 2021 Nepal Forest Research and Training Centre Multiple Use Forest Development Strategy was prepared.
30 Preparation of Churiya Protected Area Management Plan of Udayapur District 2021 Udayapur, Province No. 1 Division Forest Office Udayapur Forest Inventory, Mapping including distribution of vegetation, rivers and other water resources and Boundary survey using GPS and satellite image, Delineation of degraded forest, grazing land,etc.
31 IEE of Sunkoshi Village Resort 2020 Banepa Municipality, Ward no. 6, Kavrepalanchowk, Bagmati Province Sunkoshi Village Resort Pvt. Ltd. Preparation of ToR of IEE Study. Baseline Study of Socio-economic, Physical and Biological Environment of the Project Area. Impact and Issues Identification, Alternative Analysis of Different Aspects of Project, Identification of Mitigation and Enhancement Measures, Preparation of Environmental Management Plan and Monitoring Schedule.
32 IEE of Rara Lake Ramsar Site Management Plan (2021-2025) 2020 Mugu, Karnali Province Rara National Park Preparation of ToR of IEE Study. Baseline Study of Socio-economic, Physical and Biological Environment of the Project Area. Impact and Issues Identification, Alternative Analysis of Different Aspects of Project, Identification of Mitigation and Enhancement Measures, Preparation of Environmental Management Plan and Monitoring Schedule.
33 Temporal Mapping and Measurement of River Bed width of 64 River System in Chure region managed by Chure Board at various sections of Chure Bhabar Dun and Terai-Madesh 2020 Nepal President Chure-Tarai Madhesh Conservation Development Board Measurement of River Bed width of 64 River System in Chure region managed by Chure Board at various sections of Chure Bhabar Dun and Terai-Madesh
34 IEE for Construction of Nepal Television Relay Broadcasting Center 2020 Ajayameru Rural Municipality, Ward no. 1, Dadeldhura, Sudur Paschim Province Nepal Television IEE of Nepal Television Relay Broadcasting Center: Impact Prediction and Analysis, Alternative Analysis, Enhancement and Mitigation Measures, Monitoring Schedule.
35 IEE of Agri-inputs Manufacturing Project 2019 Birgunj Metropoliton City, Ward no. 32, Parsa, Madhesh Province Alpha Agro Pvt. Ltd. Preparation of ToR of IEE Study. Baseline Study of Socio-economic, Physical and Biological Environment of the Project Area. Impact and Issues Identification, Alternative Analysis of Different Aspects of Project, Identification of Mitigation and Enhancement Measures, Preparation of Environmental Management Plan and Monitoring Schedule.
36 Formulation of LAPA Ward no. 6 of Rainas Municipality, Lamjung 2019 Lamjung, Gandaki Province ASHA Local Adaptation Plan of Action preparation through consultation on Climate Change issues, forest fire hazard, flood hazard, landslide hazard, forest degradation due to forest clearance and agriculture issues.
37 Orientation Courses on Mainstreaming Ecosystem-based Adaptation Approaches into Local Adaptation Plan 2019 Tanahu, Pokhara, Gandaki Province EbA South Chinese Academy of Science Training on LAPA to the locals with emphasis on forest fire hazard, flood hazard, landslide hazard and forest degradation due to forest clearance and agriculture issues.
38 IEE of Shuklaphanta National Park and Buffer Zone Five Year Operation Plan 2019 Majhagaun, Kanchanpur, Sudurpashchim Province Shuklaphanta National Park Conduct IEE study or Propose five year operation plan of Shuklaphanta National Park and Buffer zone.
39 IEE of East Rapti River Training Project in Chitwan and Makawanpur District 2019 Chitwan, Makwanpur, Bagmati Province Department of Water Induced Disaster Reduction Initial Environmental Examination, is conducted before implementation of East Rapti River Training Project in Chitwan and Makawanpur District to flood area in low land which is one of the major water induced disaster in Nepal causing huge loss of physical infrastructure, human settlement, agriculture land and cultivation.
40 Update Forest Encroachment Data and Facilitation and Monitoring of Forest Encroachment Control 2019 Kathmandu, Bagmati province Department of Forests and Soil Conservation Review Forest Encroachment Status in Nepal: Use of GIS and Remote sensing for Forest Encroachment Mapping and Ground Truthing through Field Verification.
41 Preparation of Draft Land Use Policy 2019 Babarmahal, Kathmandu, Bagmati Province Department of Forests and Soil Conservation Review of existing Landuse Policy in Nepal. Review of relevant Policy, Act, Rules, Guidelines, Strategies, etc. Presentation to the Department of Forests and Soil Conservation. Report Preparation and Incorporating comments provided by the Department.
42 Criteria and Indicators of Sustainable Forest Management in Nepal 2019 Babarmahal, Kathmandu, Bagmati Province Department of Forests and Soil Conservation Review of International and National Criteria and Indicators for Sustainable Forest Management Developed Worldwide.
43 Revision of 10 Community Forest Operatinal Plans of Baglung DFO 2019 Baglung, Gandaki Province Division Forest Office Baglung Revision of 10 CFUG Operation Plan. Discussion with CFUG, Collection and Revision of Forest status through Forest Inventory.
44 Preparation of Five Years Forest Management Plan and IEE of Baglung DFO 2019 Baglung, Gandaki Province Division Forest Office Baglung GIS Mapping of forest types and forest management regimes. Review and Delineation of Forest Fire Risk Areas, Landslide Hazard Areas, Potential Scientific Forest Management Sites, Forest Degradation Sites, Rotation Grazing Sites, etc. through Stakeholder’s Consultation.
45 Verification Agent for the Ideas to Impact Programme Adaptation at Scale Prize 2019 Nepal IMC Worldwide This task focused on Field Verification of National and Local NGOs, Private Sectors involved in Climate Change Adaptation, Scientific Forest Management and Zero Carbon Emission.
46 Assessment of Current Status of Breeding Seed Orchards (BSO) 2019 Pokhara, Kaski, Gandaki Province Forest Seed Laboratory and Storage Center Assessment of Breeding Seed Orchards (BSOs) in 9 districts containing BSOs of either one or more species through GIS mapping, Field visits, Forest Resource Inventory and Consultations with stakeholders.
47 Initial Environmental Examination of Piggery Industry Park Project (PIPP) 2019 Bijayachowk, Lekhnath, Kaski, Gandaki Province Bungur Breeder Farmer Preparation of ToR. Conducting Baseline survey on different aspects of Socio-economic, Physical and Biological Environment of Project area. Impact and Issues Prediction and Analysis of the project. Alternative Analysis, Mitigation and Enhancement Measures Identification, Preparation of Environment Management Plan with Monitoring schedule.
48 Supplementary Environmental Impact Assessment of Siddartha Cable Car 2019 Butwal Sub-Metropolitan City, Ward no. 9, Rupandehi, Lumbini Province Siddartha Cable Car Pvt. Ltd. Since It is SEIA, ToR and Scoping was not prepared. Baseline Study of Socio-economic, Physical and Biological Environment of the Project Area was done through field visit, survey and GIS mapping. Impact and Issues Prediction, Alternative Analysis of different aspects of Project, Identification of Mitigation and Enhancement Measures, Preparation of Environmental Management Plan and Monitoring Schedule.
49 Initial Environmental Examination (IEE) of 20 meter Ground Base (Steel Angular) Tower, Namche Bazar 2019 Namche bazar, Khumbu Pasang Lhamu Rural Municipality, Ward no. 5, Solukhumbu, Province No. 1 Nepal Telecom Wireless Services Directorate Preparation of ToR of IEE Study. Baseline Study of Socio-economic, Physical and Biological Environment of the Project Area. Impact and Issues Identification, Alternative Analysis of Different Aspects of Project, Identification of Mitigation and Enhancement Measures, Preparation of Environmental Management Plan and Monitoring Schedule.
50 Environmental Impact Assessment(EIA) of Butwal Mandap 2019 Ramnagar, Butwal Sub-Metropolitan City, Ward No. 10, Rupandehi, Lumbini Province Department of Urban Development and Building Construction EIA of Butwal Mandap (International Convention Hall and Exhibition Centre), Rupandehi District.
51 Study of Status of Medicinal Plants of Rolpa district 2018 Liwang, Rolpa, Lumbini Province District Forest Office Rolpa Narrative description of Project: Assessment of Medicinal plant (Sustainable harvesting of MAPs) in Rolpa district, Field visit, Consultation with stakeholder, local community, Collection of sample, GIS Mapping and Spatial analysis, Data analysis and Report writing.
52 Initial Environmental Examination of Hotel Barahi 2018 Durbarmarg-6, Pokhara, Kaski Barahi Housing and Leasing Company Pvt Ltd Baseline study of project area and surrounding environment. Impact identification, prediction, alternative analysis, mitigation measures, augmentation measures. EMP formulation
53 Comprehensive Analysis On Forest Productivity Of Laljhadi-Mohana Protected Forest 2018 kanchanpur,Kailali, Sudurpashchim Province WWF Nepal Forest Resource Assessment, Carbon Stock Estimation, Forest Inventory, and Mapping using GIS and Satellite image, NTFP Identification, Soil Parameters, Biodiversity/ Wildlife Assessment.
54 Initial Environmental Examination of Hotel Barahi 2018 Durbarmarg, Pokhara Metropolitan City, Ward no. 6, Kaski, Gandaki Province Barahi Housing and Leasing Company Pvt. Ltd. Preparation of ToR. Conducting Baseline survey on different aspects of Socio-economic, Physical and Biological Environment of Project area. Impact and Issues Prediction and Analysis of the project. Alternative Analysis, Mitigation and Enhancement Measures Identification, Preparation of Environment Management Plan with Monitoring schedule.
55 Initial Environmental Examination (IEE) of Mechi Poultry (Unit-B) 2018 Haldibari, Haldibari Rural Municipality, Ward no. 4, Jhapa, Province No. 1 Mechi Poultry Pvt. Ltd. Preparation of ToR of IEE Study. Baseline Study of Socio-economic, Physical and Biological Environment of the Project Area. Impact and Issues Identification, Alternative Analysis of Different Aspects of Project, Identification of Mitigation and Enhancement Measures, Preparation of Environmental Management Plan and Monitoring Schedule.
56 Initial Environmental Examination (IEE) of Marsyangdi Poultry 2018 Aabukhairini Rural Municipiality, Ward no. 2, Tanahu, Gandaki Province (Kathmandu Metropolitan City, Ward no. 16, Balaju (Corporate Office)) Marsyangdi Poultry Pvt. Ltd. Preparation of ToR of IEE Study. Baseline Study of Socio-economic, Physical and Biological Environment of the Project Area. Impact and Issues Identification, Alternative Analysis of Different Aspects of Project, Identification of Mitigation and Enhancement Measures, Preparation of Environmental Management Plan and Monitoring Schedule.
57 Initial Environmental Examination (IEE) of Mechi Poultry (Unit-A) 2018 Duwagadi, Mechinagar Municipality, Ward no. 14, Jhapa, Province No. 1 Mechi Poulty Pvt. Ltd. Preparation of ToR of IEE Study. Baseline Study of Socio-economic, Physical and Biological Environment of the Project Area. Impact and Issues Identification, Alternative Analysis of Different Aspects of Project, Identification of Mitigation and Enhancement Measures, Preparation of Environmental Management Plan and Monitoring Schedule.
58 Mid-term Monitoring and Evaluation of National Biodiversity Strategy and Action Plan (2014-2020) 2018 Kathmandu, Bagmati province Ministry of Forests and Environment Mid-Term Monitoring and Evaluation of National Biodiversity Strategy and Action Plan. Review of Published and Unpublished Document, Projects and Field Report.
59 Preparation of Management Plan of Harpan River Watershed of Kaski District and IEE Study 2017 Kaski, Gandaki Province Division Forest Office The project prepared Watershed Management Plans of Harpan River Watershed of Kaski district.
60 Preparation of Management Plan of Rati and Jati River Watershed of Parbat District and IEE Study 2017 Kaski, Gandaki Province Division Forest Office The project prepared Watershed Management Plans of Rati and Jati River Watershed of Parbat district.
61 Preparation of Management Plan of Three Watershed Area of Syanja District and its IEE Study 2017 Kaski, Gandaki Province District Forest Office Kaski Identification of Potential Hazard Mapping, Flood, Landslide and Forest Fire prone areas. Hazard mapping using GIS, Remote Sensing and Public Consultation. Identification of Vulnerable Area and Projecting Potential Risk Area. Forest restoration for Control of Landslides.
62 Preparation of Management Plan of Rauta Protected Forest 2016 Udayapur, Province No. 1 District Forest Office Udayapur Forest Survey, Consultation with Stakeholders were prime task conduced for Resource survey and Mapping including distribution of vegetation, rivers and wetland and other water resources and Boundary survey using GPS and satellite image.
63 Technical Assistance for Planning and Procurement Activities 2016 Babarmahal, Kathmandu, Bagmati Province Multi Stakeholder Forestry Programme Literature Review, Consultation with Experts.
64 Thematic Areas of Climate Change 2015 Kathmandu, Bagmati province Climate Change And Management Division Preparation of Thematic Areas on Climate change. Review of Published and Unpublished Literatures.
65 Preparation of a Conceptual Report on Integration of Agriculture and Forestry Strategies 2014 Forestry Complex, Babarmahal, Kathmandu, Bagmati Province Multi Stakeholder Forestry Programme Preparation of Conceptual Report on Integration of Agriculture and Forestry Strategies. Review of Published and Unpublished Documents.
66 Technical Assistance for Planning, Monitoring and Evaluation for Programme Coordinator’s Office 2014 Forest Complex, Babarmahal, Kathmandu, Bagmati Province Multi Stakeholder Forestry Programme Technical Assistance for Planning, Monitoring and Evaluation of MSFP Program in Programme Coordinator’s Office.
67 Preparation of integrated plan on forest conservation and management of Chure region, Udayapur district 2012 Udayapur, Province No. 1 DFO Udayapur Preparation of integrated plan on forest conservation and management of Chure region
68 Preparation of IEE of Parsa Wildlife Reserve Extension 2011 Aadharbhar, Bara, Madhesh Province Parsa Wildlife Reserve Office Initial Environmental Examination of the Parsa Wildlife Reserve Area Extension: Impact Prediction and Analysis, Alternative Analysis, Enhancement and Mitigation Measures, Monitoring Schedule.
69 Preparation of Management Plan of Madane Protected Forest 2011 Gulmi, Lumbini Province Department of Forests and Soil Conservation Under the approved annual workplan 2067/68 of Department of Forest, Protected Forest Management Plan of Madane Protected Forest was prepared. It has included Literature review of existing Policy, Act, Regulation and Guideline on Forest, Field Observation, Survey, Consultation with Stakeholder of AMC and DFO, DFCC. Vegetation, Wetland including rivers and lakes and other water resources and Boundary Survey using GPS and satellite image. Formulation of Integrated Management Plan for the development and conservation of Laljhadi Mohana Protected Forest.
70 Preparation of Management Plan of Laljhadi Mohana Protected Forest 2011 kanchanpur,Kailali, Sudurpashchim Province Department of Forests and Soil Conservation Forest Resource Assessment, Carbon Stock Estimation, Forest Inventory and Mapping using GIS and satellite image adapting FRA techniques, NTFP Identification, Soil Parameters, Biodiversity/ Wildlife Assessment.
71 Preparation of Management Plan of Khata Protected Forest 2011 Bardiya, Lumbini Province Department of Forests and Soil Conservation Under the approved annual workplan 2067/68 of Department of Forest, Protected Forest Management Plan of Khata Protected Forest was prepared. It has included Literature review of existing Policy, Act, Regulation and Guideline on Forest, Field Observation, Survey and Consultation with stakeholder of AMC and DFO, DFCC.
72 Preparation of Management Plan of Basanta Protected Forest 2011 Kailali, Sudurpashchim Province Department of Forests and Soil Conservation Under the approved annual workplan 2067/68 of Department of Forest, Protected Forest Management Plan of Basanta Protected Forest was prepared.
73 Preparation of Management Plan of Panchase Protected Forest 2011 Kaski, syangja, parbat, Gandaki Province Department of Forests and Soil Conservation Under the approved annual workplan 2067/68 of Department of Forest, Protected Forest Management Plan of Panchase Protected Forest was prepared. It includes Literature review of existing Policy, Act, Regulation and Guideline on Forest, Field Observation, Survey and Consultation with stakeholder of AMC and DFO, DFCC.